Wednesday 19 June 2019

CDBB – Round Table 8 event on ISO 19650 compliant BIM


On 17th June 2019 I was privileged to be invited to a round table event hosted by the Centre for Digital Built Britain (CDBB) to discuss how the new ISO 19650 standard was going to impact asset and facilities managers.  I was genuinely interested to see the parties from the Facilities Management (FM) sector who were looking at this and developing strategies to utilise the information and data provided by the Building Information Modelling (BIM) process to improve FM delivery and lifecycle management.  The question posed was relatively simple:

Delivery of ISO19650 compliant BIM, and in turn a digital built Britain, offers significant benefits to asset owners and operators, are you identifying and realising these benefits and what is still required to help you to make BIM ‘business as usual’?’


At this point, if you are not a ‘BIM bunny’ I should explain briefly that BS 1192 is a series of documents that were developed to help standardise and deliver BIM to the requirements of the British Government.  These documents have subsequently been superseded by the International standard ISO 19650.  This is a simplification but, essentially, there is much discussion about the changes between the two sets of documents.  In my opinion, the lack of FM engagement is the saving grace here as ISO 19650 is as new to FM as the BIM concept anyway (I am being cynical here, forgive me).

As this article is not about the standards themselves, I’ll move on and back to the event.

Whilst there were key FM personalities from Sodexo, John Lewis, Higher Education and Government/MOD present, it was disappointing to see the lack of uptake from other invited FM organisations on the subject.  Is this due to lack of understanding of BIM generally or that FM feels that the ISO is not relevant to them?

I’d be happy to take responses from the sector, invited or not.

Accepted is the fact that Parts 1 & 2 deal with the first two BS 1192 documents which are mostly concerned with design and construction (although they lay the ‘ground rules’ for BIM delivery).


I’ve been moving around in ‘BIM’ circles for at least 6 years now, constantly banging the drum for FM involvement but, feel the industry has moved forward very little in this time.  I should say at this point that there are laudable works going on with organisations such as IWFM, The BIM Alliance and BIM4FM groups but, in real terms the FM sector is still not engaging with the BIM process.
So why is this?  I’ve already spoken at numerous events, written articles and spoken to many Tier 1 FM suppliers with little or no forward movement.  I have concluded that the BIM4FM revolution must be client driven.  Neither the FM suppliers (with a few notable exceptions) or FM software industry are moving fast enough to drive the change that is needed.

I see plenty of ‘BIM for FM’ advice being peddled by application vendors with very little real substance  or actual evidence of development to either meet the BIM challenge (for traditional CAFM/IWMS applications) or to understand the complexity of FM operations (this is levelled squarely at app vendors who have some 3D viewer capability and rudimentary work reporting function.  Stop telling people you are FM software, please).


How do we engage FM as a sector in a subject that is going to impact on them for the foreseeable future?

The round table event was number 8 in a series of 9 events held by the CDBB and should have been overflowing with FM’s champing at the bit to inform the world about how the new standard would impact/help FM make use of BIM data.  Sadly, as at so many of these type of events, FM came up short.
I’m used to working alone in hostile environments (not that this event was at all hostile) with little or no support so, not entirely outside my comfort zone although, I continue to be disappointed by what I see as my sectors lack of involvement.

So how did the event shape up?

The discussion centred as much around the involvement (or to be more correct, lack of involvement) of FM during the BIM process as it did trying to answer the question.  It was very clear that of the FM personalities present, there was a frustration that it was difficult to get FM involved early enough in projects.  There are always notable exceptions but, these tend to be larger organisations or ones with strong client focus on owning and utilising their own data.


It was also apparent that there was a general acceptance that there needs to be an interface person/organisation/appointment that bridges the gap between client/contractor, AEC/FM, Capex/Opex etc.  This function needs to understand the language of both sides of the AEC/FM areas and deliver the client brief.  Moreover, this function may need to consult on all sides to advise, address, mediate and educate.  A tall order.

One of the interesting arguments was how to ‘sell’ this to the client.  BIM should save money rather than cost more.  That said, this advice has a value but, cannot be free if we are to avoid people asking for everything.  We need to get clients away from blanket statements like ‘I want Level 2’ without having any idea what that actually means or how it fits their vision.


BIM for FM is not going to benefit from information overload and the only way that we can ensure the effectiveness of the process for the Operate and Maintain phase is to understand what information and data is:

a.     Important
b.     Required
c.     Benefits the organisation
d.     Delivers value during the lifecycle of the Asset

To ensure this is achieved at the right time during a project lifecycle, FM involvement must come earlier.

I’m looking forward to the results of the round table series and hope that we can change the status quo.

If you have any comments, would like to discuss BIM in the FM environment or have case studies you’d like to share with the wider FM community, please drop us a line.






4 comments:

  1. I am attracted by the info which you have provided in the above post.System Furniture Johor It is genuinely good and beneficial info for us. Continue posting, Thank you.

    ReplyDelete
  2. International Standards Wow, cool post. I'd like to write like this too - taking time and real hard work to make a great article... but I put things off too much and never seem to get started. Thanks though.

    ReplyDelete
  3. I am very thankful to you that you have shared this great information with us. Here I find some different kind of knowledge, and it is useful for everyone. Thanks for share it.office furniture plano tx

    ReplyDelete
  4. I liked your work and, as a result, the manner you presented this content about garden benches for sale.It is a valuable paper for us. Thank you for sharing this blog with us.

    ReplyDelete